The Impact of Risk Determinant and Efficient Engineers on the Performance of Construction Projects in Libya

International Journal of Business Society, Vol. 5, Issue 8
Ousama.J.SalehDr. S. M. Ferdous Azam
Risk DeterminantEfficient EngineersPerformance of Construction ProjectsLibya
PDFRegular IssueDOI: 10.30566/ijo-bs/2021.10.62
5Volume
8Issue

Abstract

This study aims to determine the impact of risk determinants and efficient engineers on the performance of construction projects in Libya. The current study has used the quantitative research approach. In the quantitative approach, the researchers used the questionnaire to collect the primary data from the research respondents. The population of the study was all the staff who work in the unlisted construction projects in Libya. The participants’ sample in the study was 245 samples. The SPSS was used to test the relationships between the independent variables and the dependent variable.This study found positive and significant relationships between (risk-determine and efficient-Engineers) and the performance of construction projects in Libya. It is necessary to constantly train and develop employees in the management of Libyan projects at different career levels to give them skills that improve their performance. Raising their abilities, and acquiring their information about project management, risks, and the reasons for delays, especially concerning priorities (the basics of project management, planning, organisation risk study, project financing, contract management accounting and cost control, feasibility study, time management) to raise the level of project performance.

References

[1]

Khalid, L. S., & Rahman, I. A. (2019). Measuring the Effect of the External Factors on Iraqi Construction Projects Performance USING PESTLE Technique.

[2]

Barltrop, R. (2019). Oil and Gas in a New Libyan Era: Conflict and Continuity.

[3]

Elsonoki, M., Yunus, R., Yunus, S., & Hamid, A. (2020). The Adoption of Value Engineering Practices in the Libyan Construction Industry. Paper presented at the IOP Conference Series: Earth and Environmental Science.

[4]

Almamlook, R., Bzizi, M., Al- Kbisbeh, M., Ali, T., Almajiri, E. J. A. J. o. E. S. (2020). Factors Affecting Labor Productivity in the Construction Industry.

[5]

Lopez-Uceda, A., Galvin, A. P., Ayuso, J., Jimenez, J. R., Vanwalleghem, T., & Pena, A. (2018). Risk assessment by percolation leaching tests of extensive green roofs with fine fraction of mixed recycled aggregates from construction and demolition waste. Environ Sci Pollut Res Int, 25(36), 36024-36034. doi:10.1007/s11356-018-1703-1

[6]

Liu, P., Li, Q., Bian, J., Song, L., & Xiahou, X. (2018). Using Interpretative Structural Modeling to Identify Critical Success Factors for Safety Management in Subway Construction: A China Study. Int J Environ Res Public Health, 15(7). doi:10.3390/ijerph15071359

[7]

Mavi, R. K., & Standing, C. (2018). Critical su ccess factors of sustainable project management in construction: A fuzzy DEMATEL -ANP approach. Journal of Cleaner Production, 194, 751- 765.

[8]

Mohammadi, A., Tavakolan, M., & Khosravi, Y. (2018). Developing safety archetypes of construction industry at project level using system dynamics. J Safety Res, 67, 17-26. doi:10.1016/j.jsr.2018.09.010

[9]

Umar, T. (2018). Causes of delay in construction projects in Oman. Middle East Journal of Management, 5(2), 121-136.

[10]

Xue, X.; Zhang, R.; Wang, L.; Fan, H.; Yang, R. J.; Dai, J. (2018). Collaborative innovation in construction project: A social network perspective. KSCE Journal of Civil Engineering, 22(2), 417-427.

[11]

Houghton, A., & Castillo-Salgado, C. (2019). Associations between Green Building Design Strategies and Community Health Resilience to Extreme Heat Events: A Systematic Review of the Evidence. Int J Environ Res Public Health, 16(4). doi:10.3390/ijerph16040663

[12]

Saeed, M. A. Y., & Bekhet, H. A. (2018). Influencing Factors of Mobile Marketing among Young Malaysian Customers. Australian Journal of Basic and Applied Sciences, 12(9), 63-72.

[13]

Saeed, M. A. Y., Bekhet, H. A., & Dhar, B. K. (2017). Constructing model to explore the influence of marketing audit on organizational performance –An innovative arena of marketing. International Journal of Business Society, 1(1), 37-47.

[14]

Zidane, Y. J.-T., & Andersen, B. (2018). The top 10 universal delay factors in construction projects. International Journal of Managing Projects in Business, 11(3), 650-672.

[15]

Zhang, Y., Liu, S., Tan, J., Jiang, G., & Zhu, Q. (2018). Effects of risks on the performance of business process outsourcing projects: The moderating roles of knowledge management capabilities. 36(4), 627-639.

[16]

Wu, X., Li, Y., Yao, Y., Luo, X., He, X., & Yin, W. (2018). Development of Construction Workers Job Stress Scale to Study and the Relationship between Job Stress and Safety Behavior: An Empirical Study in Beijing. Int J Environ Res Public Health, 15(11). doi:10.3390/ijerph15112409

Article Information

Article Details
Volume & IssueVol. 5, Iss. 8
Publication DateOct 1, 2021
Authors
Ousama.J.Saleh
Dr. S. M. Ferdous Azam
DOI
10.30566/ijo-bs/2021.10.62
PDF Download